Prospected Projects Deliverables Analysis Outlines

Of the prospected results for project contracted with Component 1, are the following:

  • 4,000 potable water cubic meters provided to Saint Katherine and Wadi Firan villages, through potable water network installation;
  • 8 water tankers (storage tanks), transporting water to Bedouin communities close to El Tur, and Sharm El Sheikh;
  • 710 potable water tanks for Bedouin houses in Bedouin communities close to El Tur, and Sharm El Sheikh;
  • Waste water system development in Tur Sinai, through constructing waste water processing station, oxidation ponds, and a major pump station;
  • Solid waste management fully-equipped project implemented in South Sinai cities, comprising land fills in Sharm El Sheikh and Tur Sinai, together with a Solid waste processing factory in Sharm El Sheikh;
  • 4 patrol boats, and 1 vessel, for environmental protection of coral reefs in El Aqaba Bay;
  • Constructing a Mooring, Tracking and Monitoring System, for natural resources preservation;
  • Provision of supplies and equipment to the natural protectorates sector;
  • Researching a sustainable tourism study for South Sinai region.

… in addition to the following expected results of the projects contracted with Component 2:

  • 4,000 permanent, direct and indirect, job opportunities;
  • Income generation for 9,500 Bedouin households secured;
  • 4,400 livestock heads purchased and provided;
  • Mobile vet unit, serve Bedouin needs at valleys provided;
  • Health and food services to more than 9,000 Bedouin households at valleys provided;
  • 3 health care units constructed in distant areas;
  • 3300 Bedouin households provided with potable water;
  • 140 shallow wells dug (for irrigation and potable water);
  • 10 deep wells dug (for irrigation and potable water);
  • 35 wells operated with solar power;
  • 90 dams/cisterns/water tanks for Bedouins constructed;
  • 1700 acres cultivated;
  • 330 small farms for Bedouins constructed;
  • 115 distant houses provided with solar energy electricity;
  • 50 Bedouin houses built;
  • 4 one-class schools constructed;
  • 500 trainings held, serving topics of health, cultural heritage, handicrafts, managerial and planning skills, small projects management, as well as foreign languages and computer skills;
  • 22,000 young men and women trained, qualified for work at different fields;
  • Integrated training center for Bedouin women constructed at Sharm El Sheikh (Susan Mubarak Center);
  • 1-2 employment services centers constructed for South Sinai residents;
  • 3 training centers constructed;
  • 2 small micro-support support centers constructed;
  • 240 PCs provided for training centers;
  • Rehabilitation center constructed for special needs people;
  • 120,000 birds secured annually;
  • 1,000,000 eggs secured annually;
  • Tourist managemental system developed at Saint Katherine Monastery, and restorations to some tourist sites at Moses Mountain provided.